Student Affairs
| Title/Description | Phase | Status | |
|---|---|---|---|
|
Building 1512 - Fresh-Air Renewal/Replacement Student Affairs Scope included upgrades to the building’s fresh-air system along with several interior components including, paint, counter top replacements, re-flooring, and bathtub replacements. |
Completed/Warranty | Active |
|
McWhorter Hall Fresh-Air Renewal and Replacement Student Affairs This project involves the replacement of various interior components, surfaces and the current fresh-air system in the existing residence hall. Renovations include painting, countertop replacement, flooring replacement, and bathtub replacement. The fresh-air system which will be consolidated and replaced with a more energy efficient and maintainable solution. The unit will be installed in a newly designated space on the sixth floor. |
Construction | Active |
|
Morris Hall and Soule Hall Fresh-Air System Student Affairs Both dormitories were outfitted with new chillers and up-to-date, size appropriate air circulation equipment to improve indoor air quality. Soule Hall also received an Energy Recovery unit. |
Completed/Warranty | Active |
|
Oglethorpe House Dormitory Renovation Student Affairs This project involves basic mechanical, electrical and plumbing system upgrades as well as minor ADA and fire code upgrades to Oglethorpe House, a 494-bed residence hall. The project will be completed in two phases (Summer 2013 and Summer 2014) in order to keep the facility in operation during the 2013 - 14 school year. |
Design | Active |
|
Rutherford Hall Student Affairs Construction of a new residence hall on Myers Quad continues. This facility will be more spacious than the original Rutherford dorm, with approximately 260 beds in double rooms containing private baths. Watch construction progress from a live view camera. http://128.192.32.135/view/viewer_index.shtml?id=2286 |
Construction | Active |