Reed Plaza

  • warning: include_once(./sites/all/modules/views_attach-6.x-2.2/views_attach.theme.inc): failed to open stream: No such file or directory in S:\replicated\sites\www.architects.uga.edu\includes\theme.inc on line 645.
  • warning: include_once(): Failed opening './sites/all/modules/views_attach-6.x-2.2/views_attach.theme.inc' for inclusion (include_path='.;C:\php\pear') in S:\replicated\sites\www.architects.uga.edu\includes\theme.inc on line 645.
  • warning: include(./sites/all/modules/views_attach-6.x-2.2/views-attach-display-node-content-view.tpl.php): failed to open stream: No such file or directory in S:\replicated\sites\www.architects.uga.edu\includes\theme.inc on line 1079.
  • warning: include(): Failed opening './sites/all/modules/views_attach-6.x-2.2/views-attach-display-node-content-view.tpl.php' for inclusion (include_path='.;C:\php\pear') in S:\replicated\sites\www.architects.uga.edu\includes\theme.inc on line 1079.
  • warning: include_once(./sites/all/modules/views_attach-6.x-2.2/views_attach.theme.inc): failed to open stream: No such file or directory in S:\replicated\sites\www.architects.uga.edu\includes\theme.inc on line 645.
  • warning: include_once(): Failed opening './sites/all/modules/views_attach-6.x-2.2/views_attach.theme.inc' for inclusion (include_path='.;C:\php\pear') in S:\replicated\sites\www.architects.uga.edu\includes\theme.inc on line 645.
  • warning: include(./sites/all/modules/views_attach-6.x-2.2/views-attach-display-node-content-view.tpl.php): failed to open stream: No such file or directory in S:\replicated\sites\www.architects.uga.edu\includes\theme.inc on line 1079.
  • warning: include(): Failed opening './sites/all/modules/views_attach-6.x-2.2/views-attach-display-node-content-view.tpl.php' for inclusion (include_path='.;C:\php\pear') in S:\replicated\sites\www.architects.uga.edu\includes\theme.inc on line 1079.

Located on the north side of Sanford Stadium, this former alleyway was reconfigured in 2010 to provide two restroom facilities along with a new concessions building.  In addition, the large plaza area offers both a place to congregate and a convenient east-west passageway. This outdoor area is made available to Student Affairs to utilize as programming space throughout the year.

Type: 
Athletics
Phase: 
Completed/Warranty
Status: 
Inactive
Construction Dates
Construction Start Date: 
04/01/2010
Construction Completion Date: 
08/15/2010
Project Manager: 
Derek Schuber
Contractor: 
Turner Construction Company
Architect: 
Hughes, Good, O’Leary & Ryan, Inc. / Cooper Carry, Inc.
Project Budget: 
$8,800,000