Vertical Tabs Public InformationThe Rock Eagle 4-H Center project replaces 51 original cabins constructed in the late 1950s. Phase I includes replacement of cabins 25-29. Cabins will contain 6 rooms to accommodate approximately 22 youths (bunk beds) or 12 adults. They will also include a central meeting room. J-Number: J-192Type: 4HPhase: Completed/WarrantyStatus: InactiveConstruction Dates Construction Start Date: AS 01/15/2012 Contractor: Bon Building Services (Design-Bid-Build)Design Professional: Menefee ArchitectureProject Budget: $2,500,000Sq. Footage (New): 14,250Sq. Footage (Renovation): 0 Galleries Rock Eagle Cabins Phase I, 25-29 Gallery Picture of a renovated cabin