Projects

Title/Description Phase Status
Northwest Precinct
Infrastructure & Greenspace
A precinct master plan for the future growth and ultimate build-out to include the Special Collections Library, and other yet-to-be-determined uses.
Planning Active
Oglethorpe Dining Commons
Auxiliary Services
This project created 11,000sf of new space to accommodate an additional 250 students. Interior renovations to the existing space included a new food concept, soft seating, and several back-of-the-house improvements. The entrance was also enhanced with a landscaped plaza and a new bus stop.
Completed/Warranty Active
Oglethorpe House Dormitory Renovation
Student Affairs
This project involves basic mechanical, electrical and plumbing system upgrades as well as minor ADA and fire code upgrades to Oglethorpe House, a 494-bed residence hall. The project will be completed in two phases (Summer 2013 and Summer 2014) in order to keep the facility in operation during the 2013 - 14 school year.
Design Active
Poultry Feed Mill for the Poultry Research Complex
Academics & Research
This is the installation of new poultry feed mill equipment to replace most of the existing old and antiquated equipment.  It is an interior project that is taking place in an existing metal building.  This equipment provides poultry feed to the UGA researchers.  This facility is capable of providing several different specialty dietary mixes for different types of poultry research projects. 
Construction Active
PVAC Corridor
Infrastructure & Greenspace
Planning is underway on the pedestrian linkages through East Campus as construction is completed on the new Lamar Dodd School of Art. Innovative water quality design and revised automobile and transit routes will be addressed.
Planning Active
Ramsey Center Volleyball - Swimming / Diving Graphics
Athletics
This graphics intense project will be showcasing student athletes, coaches, and their accolades. The Volleyball-Swimming-Diving Graphics were installed in 2012 along the shared corridor between the Ramsey Center Natatorium and the Volleyball Courts. The graphics highlight current and former student athletes, coaches and provide information about the teams' history.
Completed/Warranty Active
Research Park
Infrastructure & Greenspace
A master plan to continue development of the UGA Research Park.
Planning Active
Rock Eagle 4H - Sutton Hall Renovation, Phase II
4H and other UGA Satellite Campuses
The renovation of Sutton Hall converted the two dining areas into assembly areas, the serving lines into reception areas, and an office area into a laundromat and storage space.
Completed/Warranty Active
Rock Eagle Cabins Phase I, 25-29
4H and other UGA Satellite Campuses
The Rock Eagle 4-H Center project replaces 51 original cabins constructed in the late 1950s. Phase I  includes  replacement of cabins 25-29. Cabins will contain 6 rooms to accommodate approximately 22 youths (bunk beds) or 12 adults. They will also include a central meeting room.
Completed/Warranty Active
Rock Eagle Cabins Phase II, 35-36 & 2-6
4H and other UGA Satellite Campuses
The Rock Eagle 4-H Center has begun an ambitious construction program to replace 51 of their original cabins which were constructed in the late 1950s. Phase II of this project includes the replacement of cabins 2-6, as well as cabins 35 and 36.
Construction Active