Jump to navigation

  • F&A Facilities Home
  • Home
    • Campus Planning
    • Campus Maps and GIS
    • Design & Construction
    • Historic Preservation
    • Campus Interiors
    • Policies
  • About OUA
    • Directory
    • Mission/Description of Services
    • Location
    • About OUA
  • In the News
    • Staff Awards & Achievements
  • Construction Advisories
  • Feedback
Home

Historic Preservation Master Plan

  • Whole Master Plan (.pdf) 
  • Sections (from the Table of Contents) 
    • Front Matter
    • Introduction
    • University of Georgia Historical Background
    • University of Georgia Historical Contexts
    • Preservation Approach 
      • UGA Guiding Principles (section excerpt)
      • UGA HPMP Categories (section excerpt)
      • Actions (section excerpt)
      • Standard Operating Procedures (section excerpt)
      • ​Implementation Matrix (section excerpt)
    • University of Georgia Preservation Guidelines
    • Assessment of University of Georgia Cultural Resources
    • Athens Campus Assessment
    • Griffin Campus Assessment
    • Tifton Campus Assessment
    • Georgia Mountain Research and Education Center Assessment
    • 4-H Centers: Rock Eagle and Wahsega Assessment
    • Marine Institute at Sapelo Island Assessment
    • Skidaway Institute of Oceanography Assessment
    • Bamboo Farm and Coastal Gardens Assessment
    • Bibliography
    • Appendices
      • Athens Campus Timeline
  • F&A Facilities Home
  • Home
    • Campus Planning
      • Overview
      • Master Plan 1998 & 2008
      • Innovation District
      • Capital Outlay Process
      • Transportation Planning
      • Watershed Planning
      • Historic Plans
    • Campus Maps and GIS
      • Overview
      • Interactive Campus Map
      • Student/Study Space Locator Map
      • Active Construction Projects Map
        • Construction Advisory Maps
      • Accessibility Map BETA
      • PDF Maps
    • Design & Construction
      • Process/Overview
      • Current Capital Projects
      • Campus Standards
      • Infrastructure/Engineering
      • Major Renovation & Repairs
      • F&A Annual Report
      • Projects
      • DLFM Process
    • Historic Preservation
      • Historic Preservation Master Plan
        • UGA HPMP Guiding Principles
        • UGA HPMP Categories
        • HPMP Actions
        • HPMP Standard Operating Procedures
          • SOP 1: Campus Preservation Officer
          • SOP 2: Consultation and Reporting
          • SOP 3: Recordation
          • SOP 4: 10-Year Reevaluation
          • SOP 5: Excavation and Archaeology
          • SOP 6: Historic Resource Studies
          • SOP 7: Best Management Practices
          • SOP 8: Campus Preservation Officer Consultation
          • SOP 9: State Historic Preservation Office (SHPO) Consultation
          • SOP 10: Determination of Eligibility
          • SOP 11: Assessment of Impact/ Effect
          • SOP 12: Demolition
          • SOP 13: Mitigation
          • SOP 14: Public Hearings
        • HPMP Implementation Matrix
        • How to Use the HPMP Implementation Matrix
      • HPMP Interactive Map
        • HPMP: Undefined Resources
      • Athens Campus HPMP Timeline
      • Archaeology
      • Projects Database
      • Athens Galleries
      • Griffin Galleries
      • Tifton Galleries
    • Campus Interiors
      • Overview
      • Galleries
    • Policies
  • About OUA
    • Directory
    • Mission/Description of Services
    • Location
    • About OUA
  • In the News
    • Staff Awards & Achievements
  • Construction Advisories
  • Feedback
  • Campus Planning
    • Overview
    • Master Plan 1998 & 2008
    • Innovation District
    • Capital Outlay Process
    • Transportation Planning
    • Watershed Planning
    • Historic Plans
  • Campus Maps and GIS
    • Overview
    • Interactive Campus Map
    • Student/Study Space Locator Map
    • Active Construction Projects Map
      • Construction Advisory Maps
    • Accessibility Map BETA
    • PDF Maps
  • Design & Construction
    • Process/Overview
    • Current Capital Projects
    • Campus Standards
    • Infrastructure/Engineering
    • Major Renovation & Repairs
    • F&A Annual Report
    • Projects
    • DLFM Process
  • Historic Preservation
    • Historic Preservation Master Plan
      • UGA HPMP Guiding Principles
      • UGA HPMP Categories
      • HPMP Actions
      • HPMP Standard Operating Procedures
        • SOP 1: Campus Preservation Officer
        • SOP 2: Consultation and Reporting
        • SOP 3: Recordation
        • SOP 4: 10-Year Reevaluation
        • SOP 5: Excavation and Archaeology
        • SOP 6: Historic Resource Studies
        • SOP 7: Best Management Practices
        • SOP 8: Campus Preservation Officer Consultation
        • SOP 9: State Historic Preservation Office (SHPO) Consultation
        • SOP 10: Determination of Eligibility
        • SOP 11: Assessment of Impact/ Effect
        • SOP 12: Demolition
        • SOP 13: Mitigation
        • SOP 14: Public Hearings
      • HPMP Implementation Matrix
      • How to Use the HPMP Implementation Matrix
    • HPMP Interactive Map
      • HPMP: Undefined Resources
    • Athens Campus HPMP Timeline
    • Archaeology
    • Projects Database
    • Athens Galleries
    • Griffin Galleries
    • Tifton Galleries
  • Campus Interiors
    • Overview
    • Galleries
  • Policies

"Creating Tradition through Architecture and Campus Planning"

University of Georgia | Office of University Architects
1180 East Broad Street, Athens, GA 30602
Phone: 706-542-3605 | Email: facilitiesinquiries@uga.edu

Privacy | Submit a Student Complaint

Login