All Projects
Primary tabs
Title/Description | Primary Project Manager | Phase | Status | |
---|---|---|---|---|
Poultry Science Research Renovation Feasibility Study |
Planning |
Active |
||
Poultry Sciences Research Facilities South Milledge UGA’s Poultry Science Department’s Poultry Research Center (PRC); a multi-building complex that comprises buildings that have evolved from the mid-1930s until the most recent 3 buildings which were built in 1998. |
Dane Richards |
Completed/Warranty |
Inactive |
|
PVAC Corridor Planning is underway on the pedestrian linkages through East Campus as construction is completed on the new Lamar Dodd School of Art. Innovative water quality design and revised automobile and transit routes will be addressed. |
Planning |
Inactive |
||
Ramsey Center The Ramsey Student Center for Physical Activities is a 430,000 sq. ft. facility which includes five gymnasia, three pools, and a 44-ft climbing wall. Upon completion in 1995, it was the nation's largest such on-campus facility and was recognized by Sports Illustrated. |
Completed/Warranty |
Inactive |
||
Ramsey Center Volleyball - Swimming / Diving Graphics This graphics intense project will be showcasing student athletes, coaches, and their accolades. The Volleyball-Swimming-Diving Graphics were installed in 2012 along the shared corridor between the Ramsey Center Natatorium and the Volleyball Courts. |
Gwynne Darden |
Completed/Warranty |
Inactive |
|
Ramsey Center: Swim & Dive Video Board Replacement of existing outdated electroni timing boards with new videoboards. |
Completed/Warranty |
Inactive |
||
Redcoat Band Tower Installation of a Teaching Tower for UGA Redcoat Band at the Redcoat Band practice field. |
Chuck Cartwright |
Completed/Warranty |
Inactive |
|
Reed Hall With renovations completed in August 1998, the co-ed residence hall houses 296 students. After renovations, Reed Hall has become compliant with the requirements of the Americans with Disabilities Act. |
Completed/Warranty |
Inactive |
||
Reed Plaza Located on the north side of Sanford Stadium, this former alleyway was reconfigured in 2010 to provide two restroom facilities along with a new concessions building. In addition, the large plaza area offers both a place to congregate and a convenient east-west passageway. |
Derek Schuber |
Completed/Warranty |
Inactive |
|
Research Park A master plan to continue development of the UGA Research Park. |
Planning |
Inactive |